Softbank Robotics  |  Interiors

Client:  Hold Thyssen
Project Location:  Boston, MA
Project Size:  6,073 SF
Status:  Completed in 2018

The Challenge: Special attention was required in coordinating the selection and transitioning of new flooring materials over the existing substrate of 3/4" plywood over plank on timber. 

Project Scope:

  • Interior alterations to provide new glass front offices and conference rooms, open office work area, breakroom, robot storage and repair areas.

  • New loading dock access with epoxy flooring to support moderate fork lift traffic.


 

Photography © Gregg Shupe 2018 | Shupe Studios