800 Huntington Avenue Garage Restoration

Client |  CB Richard Ellis/New England
Project Location  |  Boston, MA
Project Size  |  62,000 s.f.
Construction Cost  |  $250,000 (approx.)

Project Scope:

  • Existing parking garage located at a medical building in Boston with minimal traffic coating system installed during original construction.

  • Parking garage was reviewed, specifications and drawings prepared, and ultimately a traffic coating system installed on all elevated levels of parking.

  • The slab on grade received a clear water repellent.

  • There was a limited amount of painting completed on the exposed steel structure.

  • The project was completed in multiple phases with a small crew so that the garage could remain open.